Practice Test #4


Test ID = 112

This is a self-grading exam. Answers are entered by selecting the checkbox corresponding to your answer choices(s) or by typing-in your answers in the case of fill-in test items (if applicable). The examination is scored by clicking the 'Grade Test' button at the bottom of the form. Correct answers and explanations are found through hyperlinks at the bottom of the page. This test requires that your browser be JavaScript enabled. Please verify that JavaScript is activated if you encounter any problems. NOTE: Fill-in/Essay test items (if any) cannot be graded and thus are ignored. However, you may view these test items for their correct answers in the 'Correct Answers' section below (if provided by your instructor).




1. (190) The choice of business entity affects all of the following EXCEPT:
    (A) Taxes
    (B) Liability and worker's compensation
    (C) Unemployment
    (D) Financial management and compensation


2. (550) If a partner leaves a partnership and the RMI is the remaining partner, the contractor must do all of the following EXCEPT:
    (A) Provide a new bond
    (B) Change the RMI
    (C) Provide new insurance
    (D) Obtain a new CCB license before continuing to conduct construction activities
    REF: RMI change may or may not be required depending on the circumstances


3. (410) A commercial developer is exempt from all of the following licensing requirements EXCEPT:
    (A) Continuing education
    (B) Testing and training requirement
    (C) Insurance and bonding
    (D) Experience requirement
    REF:


4. (200) Where is an assumed business name filed?
    (A) the CCB
    (B) the Oregon Department of Revenue
    (C) the IRS
    (D) the Oregon Secretary of State


5. (230) How long is the training required to obtain a contractor's license?
    (A) 8 hours
    (B) 16 hours
    (C) 32 hours
    (D) Up to 80 hours


6. (530) A contractor's commercial general liability insurance covers:
    (A) The contractor's workmanship
    (B) Damage or injury as a result of the contractor's work
    (C) Warranty work
    (D) A or B
    REF: Bond covers workmanship. Insurance covers damage as a result of work.


7. (840) All of the following are common enforcement actions the CCB can impose against a contractor EXCEPT:
    (A) Loss of license
    (B) Imposing fines
    (C) Increasing bond amounts
    (D) Barring contractors from public works contracts


8. (630) The HPA notice requires a contractor to protect the residential property owner from a lien by choosing any of the following methods EXCEPT:
    (A) Providing a bond
    (B) Purchasing Title Insurance
    (C) Finishing the sale after lien rights have expired
    (D) Having at least 20% of the sales price in an escrow account


9. (60) The laws that govern contractors are:
    (A) ORS Chapter 701
    (B) ORS Chapter 656
    (C) OAR 437
    (D) OAR 812


10. (600) A contractor contracting directly with a residential property owner is required to have a written contract with the owner when the contract price is:
    (A) $1,000 or more
    (B) $2,000 or more
    (C) More than $2,000
    (D) Any amount


11. (520) When a bonding company provides notice the contractor's bond is cancelled and the contractor doesn't provide a new bond, in what time period will the CCB suspend the contractor's license:
    (A) Immediately
    (B) 10 days
    (C) 15 days
    (D) 30 days
    (E)


12. (430) All of the following substitute as construction experience for a commercial endorsement EXCEPT:
    (A) One year in an apprenticeship program
    (B) A bachelor's degree in a construction-related field
    (C) Master's degree in economics
    (D) An associates degree in building managment
    REF: Completion of an apprenticeship program may substitute for construction experience.


13. (120) A licensed landscape business is exempt from contractor licensing if the business builds any of the following EXCEPT a(n):
    (A) Arbor
    (B) Gazebo
    (C) Patio
    (D) Deck


14. (510) A contractor or subcontractor must post a public works bond with the CCB when working on a public works project valued at:
    (A) $100,000 or more
    (B) $30,000
    (C) More than $100,000
    (D) Any amount on a public project


15. (700) Commercial contractor complaints are first:
    (A) Filed in court or arbitration
    (B) Mediated
    (C) Filed with contractor's bonding company
    (D) Filed with the CCB


16. (370) Which of the following license endorsements requires the contractor to have an RMI:
    (A) Home Services contractor
    (B) Residential Developer
    (C) Commercial Developer
    (D) Residential Locksmith Services contractor


17. (800) The maximum fine the CCB can assess per offense is:
    (A) $2,000
    (B) $4,000
    (C) $5,000
    (D) $10,000


18. (710) The CCB charges a residential property owner filing a complaint against a contractor $________ to file a complaint after CCB jurisdiction is established:
    (A) $50
    (B) $100
    (C) $250
    (D) $325


19. (110) Who owns the money in a corporation:
    (A) The stockholders
    (B) The Board of Directors
    (C) The employees
    (D) The corporation


20. (180) How many Small Business Development Centers are located in Oregon?
    (A) 8
    (B) 14
    (C) 19
    (D) More than 25


21. (30) All of the following are true EXCEPT:
    (A) A joint venture is normally established for a single, large project
    (B) Partnerships allow for unlimited personal liability of general partners
    (C) Partners in a general partnership should outline responsibilities and goals at the outset of the partnership
    (D) A limited partnership has only limited partners


22. (10) Which of the following is true regarding a sole proprietorship?
    (A) A sole proprietorship cannot be sold
    (B) An assumed business name cannot be transferred to a new owner
    (C) In a sole proprietorship, there is no separation of assets between the business and the owner's assets
    (D) Income from a sole proprietorship is property of the business


23. (250) On Monday, Larry tells his employer, George, he's quitting on Thursday. George must give Larry his final paycheck on:
    (A) Thursday
    (B) The next regular payday
    (C) Within five business days
    (D) When Larry returns George's tools


24. (230) If workers on a construction site are pouring concrete during the meal period, the employer must:
    (A) Give them an extra break when they are finished
    (B) Pay them for the meal period
    (C) Do nothing
    (D) Give them an hour break for lunch the next day


25. (310) Federally, the Americans with Disabilities Act applies to an employer with ______ or more employees:
    (A) Six
    (B) 15
    (C) 10
    (D) Any employees


26. (210) Oregon employers, except Portland, must provide sick leave when an employer has __________ or more employees:
    (A) 6
    (B) 10
    (C) 30
    (D) 40


27. (10) The key to finding the right employee is:
    (A) Performing extensive background checks
    (B) Asking the right questions in the interview
    (C) Performing a credit check
    (D) Checking references


28. (420) Which of the following is an at-will employee:
    (A) A union electrician
    (B) A cook at McDonalds
    (C) A CEO of a corporation
    (D) A subcontractor


29. (430) An employer may not terminate an at-will employee for any of the following reasons EXCEPT:
    (A) Serving jury duty
    (B) Poor performamce
    (C) Gender
    (D) Reporting safety violations


30. (10) Sources for finding the right subcontractors include which of the following:
    (A) Cocktail lounges
    (B) Customers
    (C) Suppliers
    (D) Your subcontractors


31. (40) In order to be considered an independently established business, an independent contractor must meet ___ of five requirements:
    (A) 1
    (B) 2
    (C) 3
    (D) 5


32. (60) If a contractor bids $10,000 on a project and upon completion, it costs the contractor $13,000 to do the job, this is an example of what CCB requirement to be conisidered an independent contractor:
    (A) The independent contractor making a significant investment in the business
    (B) The independent contractor bearing the risk of loss
    (C) The independent contractor providing services to two or more different persons within a 12 month period
    (D) The independent contractor being free from a client's direction and control


33. (280) Privity of contract indicates:
    (A) Who has contracted with whom
    (B) Who parties look to in the event of a breach of contract
    (C) How much liability a general contractor accepts when the contractor contracts with subcontractors and the owner
    (D) All of the above


34. (330) On Saturday, a contractor meets a homeowner at a home show and signs a contract for a bath remodel for $12,000 in the booth at the show. The owner's right to cancel expires:
    (A) Monday, midnight
    (B) Wednesday, midnight
    (C) Thursday, midnight
    (D) Friday, midnight


35. (120) The maximum retainage allowed in Oregon construction contracts is:
    (A) 10%
    (B) 5%
    (C) 3%
    (D) Whatever the contractor or subcontractor agrees to


36. (60) In Oregon, to have a legally enforceable contract, the contractor must have all of the following EXCEPT:
    (A) A valid contractors license with the CCB
    (B) The proper license endorsement
    (C) A current bond and insurance
    (D) A contract with a person who has diminished capacity (i.e. Alzheimer's)


37. (80) What is a contract provision?
    (A) Buyer's Three Day Right to Cancel
    (B) Owner's Right to Cancel
    (C) A clause that outlines the terms of the contract
    (D) A performance standard


38. (130) Who issues a Certificate of Substantial Completion?
    (A) The general contractor
    (B) The architect
    (C) The owner
    (D) The building inspector


39. (440) All of the following are alternative dispute resolution methods EXCEPT:
    (A) Negotiation
    (B) Mediation
    (C) Partnering
    (D) Collaborative law


40. (50) How is acceptance typically made?
    (A) By verbally stating agreement with the terms of the offer
    (B) By signing the offer
    (C) By making a counteroffer
    (D) By offering consideration


41. (410) In a turnkey project the contractor does all of the following EXCEPT:
    (A) Manages construction
    (B) Obtains financing and land
    (C) Start construction before the contract documents are completed
    (D) Assembles design team and subcontractors


42. (460) A residential building for lien law purposes may contain no more than __________ units.
    (A) Four
    (B) Three
    (C) Two
    (D) One


43. (100) The Information Notice to Owner About Construction Liens is given to the homeowner by the:
    (A) Subcontractor
    (B) Original Contractor
    (C) Material Supplier
    (D) Equipment Provider
    REF:


44. (40) For the Notice of Right to a Lien, residential building means:
    (A) The owner will occupy the structure as a residence and it contains not more than four units.
    (B) The owner is not required to reside in the structure
    (C) The subcontractor is not required to provide this notice.
    (D) The contractor is not able to lien the property if the owner lives there
    REF:


45. (280) Everyone who records a Claim of Lien must then give two post claim notices, which are:
    (A) A Notice of Right to a Lien & Claim of Lien
    (B) A Notice of Filing a Claim of Lien & Notice of Intent to Foreclose
    (C) An Information Notice to Owner about Construction Liens & Notice of Fling a Claim of Lien
    (D) A Notice of Filing a Claim of Lien & Claim of Lien
    REF:


46. (330) All of the following are benefits of implementing a job cost recording system EXCEPT:
    (A) Monitoring current projects
    (B) Creating more accurate future estimates
    (C) More comprehensive review of construction documents
    (D) Providing reports for analysis


47. (150) Labor burden typically adds approximately what percentage to labor costs?
    (A) 20%
    (B) 30%
    (C) 40%
    (D) 50%


48. (300) To avoid inaccurate estimates, a contractor should do all of the following EXCEPT:
    (A) Use a spreadsheet to calculate bids
    (B) Use CSI MasterFormat or a cost estimate breakdown as an estimating framework to reduce the probablility of missing task items
    (C) Use multiplication, not division, when calculating overhead and profit
    (D) Check and re-check units of measurement to be certain the measure is accurate


49. (220) Which of the following is an example of contingency in an estimate?
    (A) The amount of money placed in the estimate to cover indirect costs (small tools, mobilization, demobilization, etc)
    (B) Five percent added to the project costs to cover the costs of the unknown (inclement weather, unforseen site conditions, uncontrollable delays, etc.)
    (C) The amount of money place in the estimate to cover the contractors' company overhead
    (D) The amount of money placed in the estimate to cover the cost of labor burden


50. (70) Construction drawings and specifications are considered part of the contract package and:
    (A) Bid documents
    (B) Supplemental forms
    (C) Project documents
    (D) Technical specifications


51. (180) ABC Construction owns an excavator for which the total cost of the excavator for the year is $20,000. The company plans to use the excavator 500 hours this year. The company will use the excavator 100 hours on this project. What is the excavator cost for this project?
    (A) $200
    (B) $400
    (C) $2,000
    (D) $4,000


52. (230) How does a contractor communicate to employees a mutual understanding of the level of quality the company expects?
    (A) Regular staff meetings with project superintendents and foremen
    (B) Safety meetings
    (C) Documents work standards and conducts regular performance reviews
    (D) Stresses quality standards in company marketing material and on the company website


53. (220) One of the most important aspects of project management is:
    (A) Accurate and detailed plans and specifications
    (B) Ensuring the customer receives a quality-built product
    (C) Detailed shop drawings
    (D) Value engineering


54. (200) If the budget is not monitored carefully, a job that was estimated correctly can:
    (A) Be turned around and made profitable
    (B) Turn into a loss for the company
    (C) Result in bankruptcy for the company
    (D) Result in loss of new customers


55. (80) The coding system used to describe materials and activities that go into a project and can be used to track tasks in a Critical Path Method chart is called:
    (A) Bar chart
    (B) Gantt chart
    (C) CSI MasterFormat
    (D) Microsoft Project


56. (70) The sequence of tasks that determines the total duration of the project is called:
    (A) Activity duration
    (B) Relationship between tasks
    (C) Critical path
    (D) Simultaneous events


57. (110) An inspection is required for all of the following EXCEPT:
    (A) Rough-in plumbing
    (B) Footing or foundation
    (C) Installing water heater
    (D) Rough-in electrical


58. (140) To obtain a permit, the square footage of the floor area that determines when an architect or engineer must prepare drawings is ___________ or more:
    (A) 2,000
    (B) 3,000
    (C) 4,000
    (D) 5,000


59. (90) On which website may a contractor find a "read only" version of many code books:
    (A) www.bcd.oregon.gov
    (B) www.oregon.gov/ccb
    (C) www.buildingpermits.oregon.gov
    (D) www.cbs.state.or.us./bcd/programs/online_codes.html


60. (170) If a contractor is building a three-story, 24-unit apartment complex, the contractor will use which specialty code?
    (A) 2014 Oregon Residential Specialty Code
    (B) 2014 Oregon Structural Specialty Code
    (C) 2014 Reach Code
    (D) ICC International Residential Code


61. (260) The exclusion limit for an employee working in asbestos is:
    (A) 0.1 fiber per cubic centimeter of air over an 8 hour period
    (B) 1.0 asbestos fibers per cubic centimeter of air over a 20-minute period
    (C) 50 micrograms per cubic meter of air over an 8 hour period
    (D) 1.0 asbestos fibers per cubic centimeter of air over a 30 minute period


62. (110) Who may administer first aid?
    (A) Doctors
    (B) Nurses
    (C) Trained employees
    (D) Anyone


63. (120) A construction employer with 11 or more employees and a job that's lasted more than one year must keep all of the following EXCEPT:
    (A) An emergency medical plan
    (B) OSHA Form 300
    (C) OSHA Form 300A
    (D) DCBS Form 801


64. (30) The laws that govern Oregon OSHA are:
    (A) OAR chapter 437, Division 1
    (B) OAR chapter 437, Division 2
    (C) OAR chapter 437, Division 3
    (D) ORS chapter 654


65. (190) Fluorescent lamp ballasts manufactured through ____________ likely contain PCB's?
    (A) 1978
    (B) 1979
    (C) 1987
    (D) 2004


66. (10) DEQ is responsible for all of the following EXCEPT:
    (A) Administering federal and state laws
    (B) Management of solid and hazardous waste
    (C) Leading the nation's environmental science, research and education efforts
    (D) Water, air and land quality


67. (140) What license is required to install a septic system:
    (A) CCB sewage disposal provider license
    (B) DEQ sewage disposal provider license
    (C) ORWD sewage disposal provider license
    (D) OHA sewage disposal provider license


68. (20) Examples of non-friable asbestos include all of the following EXCEPT:
    (A) Popcorn ceilings
    (B) Vinyl floor tile
    (C) Asbestos board shingles
    (D) Cement water pipes


69. (130) All of the following are true about window and doors assemblies EXCEPT:
    (A) Windows must be properly integrated in their new environment
    (B) Windows must be rated for the conditions in which they are installed
    (C) Flashing and weather-resisteive barriers on windows and doors are required
    (D) Window sills must include pan flashings that drain to the interior


70. (260) Which agency in Oregon develops standards designed to prevent moisture intrusion:
    (A) Construction Contractors Board
    (B) Oregon Dept of Revenue
    (C) Oregon OSHA
    (D) Building Codes Division


71. (230) All of the following are common causes of mold in exterior walls EXCEPT:
    (A) Moisture trapped within sheathing
    (B) Water leakage at floor slab
    (C) The rainscreen is unable to dry
    (D) There is no rainscreen


72. (50) To prevent condensation, two items are necessary to limit vapor movement through the building envelope. They are:
    (A) Water molecules and diffusion
    (B) Ventilation and vapor retarders
    (C) Saturated building materials and ventilation
    (D) Heat and air


73. (130) Which financial statement is typically requested by potential lenders to determine credit limits?
    (A) Balance sheet
    (B) Income statement
    (C) Cash flow statement
    (D) Working capital


74. (180) Net profit will be included in which category on the balance sheet:
    (A) Assets
    (B) Long term liabilities
    (C) Current liabilities
    (D) Owners' equity


75. (290) Retainage in Oregon is limited to:
    (A) 10%
    (B) 8%
    (C) 5%
    (D) 3%


76. (210) A lack of ____________ in a company may foretell financial problems:
    (A) Liabilities
    (B) Profit
    (C) Cash flow
    (D) Liquidity


77. (160) If an employer does not use EFTPS to deposit payroll taxes as required, the IRS can assess a penalty of:
    (A) 2%
    (B) 5%
    (C) 10%
    (D) 15%


78. (210) For new employees, an employer provides all of the following forms EXCEPT:
    (A) 1099
    (B) W-9
    (C) W-4
    (D) I-9


79. (70) Which of the following businesses is required to make federal business estimated tax payments when expected to owe $500 or more in tax?
    (A) Sole proprietorship
    (B) Corporation
    (C) S-Corporation
    (D) Partnership


80. (220) If ABC Inc. has taxable income of $1,000,000 the company owes $______________ in Oregon corporate excise tax:
    (A) $6,600
    (B) $60,600
    (C) $66,600
    (D) $66,000






Correct Answers

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80,

GO BACK TO TOP
































1. (190) The choice of business entity affects all of the following EXCEPT:
Answer: (C) Unemployment
BACK































2. (550) If a partner leaves a partnership and the RMI is the remaining partner, the contractor must do all of the following EXCEPT:
Answer: (B) Change the RMI
BACK































3. (410) A commercial developer is exempt from all of the following licensing requirements EXCEPT:
Answer: (C) Insurance and bonding
BACK































4. (200) Where is an assumed business name filed?
Answer: (D) the Oregon Secretary of State
BACK































5. (230) How long is the training required to obtain a contractor's license?
Answer: (B) 16 hours
BACK































6. (530) A contractor's commercial general liability insurance covers:
Answer: (B) Damage or injury as a result of the contractor's work
BACK































7. (840) All of the following are common enforcement actions the CCB can impose against a contractor EXCEPT:
Answer: (A) Loss of license
BACK































8. (630) The HPA notice requires a contractor to protect the residential property owner from a lien by choosing any of the following methods EXCEPT:
Answer: (D) Having at least 20% of the sales price in an escrow account
BACK































9. (60) The laws that govern contractors are:
Answer: (A) ORS Chapter 701
BACK































10. (600) A contractor contracting directly with a residential property owner is required to have a written contract with the owner when the contract price is:
Answer: (C) More than $2,000
BACK































11. (520) When a bonding company provides notice the contractor's bond is cancelled and the contractor doesn't provide a new bond, in what time period will the CCB suspend the contractor's license:
Answer: (D) 30 days
BACK































12. (430) All of the following substitute as construction experience for a commercial endorsement EXCEPT:
Answer: (A) One year in an apprenticeship program
BACK































13. (120) A licensed landscape business is exempt from contractor licensing if the business builds any of the following EXCEPT a(n):
Answer: (B) Gazebo
BACK































14. (510) A contractor or subcontractor must post a public works bond with the CCB when working on a public works project valued at:
Answer: (C) More than $100,000
BACK































15. (700) Commercial contractor complaints are first:
Answer: (A) Filed in court or arbitration
BACK































16. (370) Which of the following license endorsements requires the contractor to have an RMI:
Answer: (D) Residential Locksmith Services contractor
BACK































17. (800) The maximum fine the CCB can assess per offense is:
Answer: (C) $5,000
BACK































18. (710) The CCB charges a residential property owner filing a complaint against a contractor $________ to file a complaint after CCB jurisdiction is established:
Answer: (A) $50
BACK































19. (110) Who owns the money in a corporation:
Answer: (D) The corporation
BACK































20. (180) How many Small Business Development Centers are located in Oregon?
Answer: (C) 19
BACK































21. (30) All of the following are true EXCEPT:
Answer: (D) A limited partnership has only limited partners
BACK































22. (10) Which of the following is true regarding a sole proprietorship?
Answer: (C) In a sole proprietorship, there is no separation of assets between the business and the owner's assets
BACK































23. (250) On Monday, Larry tells his employer, George, he's quitting on Thursday. George must give Larry his final paycheck on:
Answer: (A) Thursday
BACK































24. (230) If workers on a construction site are pouring concrete during the meal period, the employer must:
Answer: (B) Pay them for the meal period
BACK































25. (310) Federally, the Americans with Disabilities Act applies to an employer with ______ or more employees:
Answer: (B) 15
BACK































26. (210) Oregon employers, except Portland, must provide sick leave when an employer has __________ or more employees:
Answer: (B) 10
BACK































27. (10) The key to finding the right employee is:
Answer: (B) Asking the right questions in the interview
BACK































28. (420) Which of the following is an at-will employee:
Answer: (B) A cook at McDonalds
BACK































29. (430) An employer may not terminate an at-will employee for any of the following reasons EXCEPT:
Answer: (B) Poor performamce
BACK































30. (10) Sources for finding the right subcontractors include which of the following:
Answer: (C) Suppliers
BACK































31. (40) In order to be considered an independently established business, an independent contractor must meet ___ of five requirements:
Answer: (C) 3
BACK































32. (60) If a contractor bids $10,000 on a project and upon completion, it costs the contractor $13,000 to do the job, this is an example of what CCB requirement to be conisidered an independent contractor:
Answer: (B) The independent contractor bearing the risk of loss
BACK































33. (280) Privity of contract indicates:
Answer: (D) All of the above
BACK































34. (330) On Saturday, a contractor meets a homeowner at a home show and signs a contract for a bath remodel for $12,000 in the booth at the show. The owner's right to cancel expires:
Answer: (B) Wednesday, midnight
BACK































35. (120) The maximum retainage allowed in Oregon construction contracts is:
Answer: (B) 5%
BACK































36. (60) In Oregon, to have a legally enforceable contract, the contractor must have all of the following EXCEPT:
Answer: (D) A contract with a person who has diminished capacity (i.e. Alzheimer's)
BACK































37. (80) What is a contract provision?
Answer: (C) A clause that outlines the terms of the contract
BACK































38. (130) Who issues a Certificate of Substantial Completion?
Answer: (B) The architect
BACK































39. (440) All of the following are alternative dispute resolution methods EXCEPT:
Answer: (C) Partnering
BACK































40. (50) How is acceptance typically made?
Answer: (B) By signing the offer
BACK































41. (410) In a turnkey project the contractor does all of the following EXCEPT:
Answer: (C) Start construction before the contract documents are completed
BACK































42. (460) A residential building for lien law purposes may contain no more than __________ units.
Answer: (A) Four
BACK































43. (100) The Information Notice to Owner About Construction Liens is given to the homeowner by the:
Answer: (B) Original Contractor
Explanation:
BACK































44. (40) For the Notice of Right to a Lien, residential building means:
Answer: (A) The owner will occupy the structure as a residence and it contains not more than four units.
Explanation:
BACK































45. (280) Everyone who records a Claim of Lien must then give two post claim notices, which are:
Answer: (B) A Notice of Filing a Claim of Lien & Notice of Intent to Foreclose
BACK































46. (330) All of the following are benefits of implementing a job cost recording system EXCEPT:
Answer: (C) More comprehensive review of construction documents
BACK































47. (150) Labor burden typically adds approximately what percentage to labor costs?
Answer: (B) 30%
BACK































48. (300) To avoid inaccurate estimates, a contractor should do all of the following EXCEPT:
Answer: (C) Use multiplication, not division, when calculating overhead and profit
BACK































49. (220) Which of the following is an example of contingency in an estimate?
Answer: (B) Five percent added to the project costs to cover the costs of the unknown (inclement weather, unforseen site conditions, uncontrollable delays, etc.)
BACK































50. (70) Construction drawings and specifications are considered part of the contract package and:
Answer: (C) Project documents
BACK































51. (180) ABC Construction owns an excavator for which the total cost of the excavator for the year is $20,000. The company plans to use the excavator 500 hours this year. The company will use the excavator 100 hours on this project. What is the excavator cost for this project?
Answer: (D) $4,000
BACK































52. (230) How does a contractor communicate to employees a mutual understanding of the level of quality the company expects?
Answer: (C) Documents work standards and conducts regular performance reviews
BACK































53. (220) One of the most important aspects of project management is:
Answer: (B) Ensuring the customer receives a quality-built product
BACK































54. (200) If the budget is not monitored carefully, a job that was estimated correctly can:
Answer: (B) Turn into a loss for the company
BACK































55. (80) The coding system used to describe materials and activities that go into a project and can be used to track tasks in a Critical Path Method chart is called:
Answer: (C) CSI MasterFormat
BACK































56. (70) The sequence of tasks that determines the total duration of the project is called:
Answer: (C) Critical path
BACK































57. (110) An inspection is required for all of the following EXCEPT:
Answer: (C) Installing water heater
BACK































58. (140) To obtain a permit, the square footage of the floor area that determines when an architect or engineer must prepare drawings is ___________ or more:
Answer: (C) 4,000
BACK































59. (90) On which website may a contractor find a "read only" version of many code books:
Answer: (D) www.cbs.state.or.us./bcd/programs/online_codes.html
BACK































60. (170) If a contractor is building a three-story, 24-unit apartment complex, the contractor will use which specialty code?
Answer: (B) 2014 Oregon Structural Specialty Code
BACK































61. (260) The exclusion limit for an employee working in asbestos is:
Answer: (D) 1.0 asbestos fibers per cubic centimeter of air over a 30 minute period
BACK































62. (110) Who may administer first aid?
Answer: (D) Anyone
BACK































63. (120) A construction employer with 11 or more employees and a job that's lasted more than one year must keep all of the following EXCEPT:
Answer: (A) An emergency medical plan
BACK































64. (30) The laws that govern Oregon OSHA are:
Answer: (D) ORS chapter 654
BACK































65. (190) Fluorescent lamp ballasts manufactured through ____________ likely contain PCB's?
Answer: (A) 1978
BACK































66. (10) DEQ is responsible for all of the following EXCEPT:
Answer: (C) Leading the nation's environmental science, research and education efforts
BACK































67. (140) What license is required to install a septic system:
Answer: (B) DEQ sewage disposal provider license
BACK































68. (20) Examples of non-friable asbestos include all of the following EXCEPT:
Answer: (A) Popcorn ceilings
BACK































69. (130) All of the following are true about window and doors assemblies EXCEPT:
Answer: (D) Window sills must include pan flashings that drain to the interior
BACK































70. (260) Which agency in Oregon develops standards designed to prevent moisture intrusion:
Answer: (D) Building Codes Division
BACK































71. (230) All of the following are common causes of mold in exterior walls EXCEPT:
Answer: (B) Water leakage at floor slab
BACK































72. (50) To prevent condensation, two items are necessary to limit vapor movement through the building envelope. They are:
Answer: (B) Ventilation and vapor retarders
BACK































73. (130) Which financial statement is typically requested by potential lenders to determine credit limits?
Answer: (A) Balance sheet
BACK































74. (180) Net profit will be included in which category on the balance sheet:
Answer: (D) Owners' equity
BACK































75. (290) Retainage in Oregon is limited to:
Answer: (C) 5%
BACK































76. (210) A lack of ____________ in a company may foretell financial problems:
Answer: (C) Cash flow
BACK































77. (160) If an employer does not use EFTPS to deposit payroll taxes as required, the IRS can assess a penalty of:
Answer: (C) 10%
BACK































78. (210) For new employees, an employer provides all of the following forms EXCEPT:
Answer: (A) 1099
BACK































79. (70) Which of the following businesses is required to make federal business estimated tax payments when expected to owe $500 or more in tax?
Answer: (B) Corporation
BACK































80. (220) If ABC Inc. has taxable income of $1,000,000 the company owes $______________ in Oregon corporate excise tax:
Answer: (D) $66,000
BACK







Created by Random Test Generator-PRO. A product of Hirtle Software.